Square-Flange Spur Planetary Gearbox · General Automation, Packaging, Conveying, Dispensing, Screwdriving Applications
General Automation, Packaging, Conveying, Dispensing, Screwdriving Applications. This page provides product configuration information, Engineering Resource Links, Motor Interface Checks, Application & Selection Support.
H Structure L1/L2 Entered from the Original Drawing. L2-X Drawing Specifications and H Differ Significantly, Not Used as Shared Selection Specifications Yet.
| Item | Parameters | Description |
|---|---|---|
| Example Model | PLF028 L1 H / L2 H | H and X Are Different Structures, Drawings Are Managed Separately |
| Gear Ratio | L1: 3/4/5/7/10; L2: 12/15/16/20/25/28/30/35/40/50/70/100 | H Original Structure Drawing; The Rated Torque Table for Some Ratios Is“/” |
| Rated Output Torque | 3–9 Nm(Only H Ratios Specified in the Drawing) | L1 4=9, 5=8.5, 7=5, 10=3, 3 Not Specified; L2 16/20/28/40=9, 25/35/50=8.5, 70=5, 12/15/30/100 Not Specified |
| Backlash | H Structure L1 ≤12 arcmin; L2 ≤15 arcmin | X Verify against the Structure-Specific Drawing |
| Rated Speed | H Structure 3000 rpm | L2-X The Drawing Gives Different Values, Not Currently Used as H Shared Model Values |
| Maximum Input Speed | H Structure 6000 rpm | By H Structure L1/L2 Original Drawing |
| Efficiency | H Structure L1 96%; L2 94% | Grouped by Stage Count |
| Maximum Axial Force | H Structure 80 N | X Check the configuration against the original drawing |
| Maximum Radial Force | H Structure 150 N | X Check the configuration against the original drawing |
| Operating Temperature | H Structure L1 -15℃~+90℃; L2 -10℃~+90℃ | The lower temperature limits differ between two-stage drawings |
| IP Rating | H Structure L1 IP65; L2 IP54 | L1-X Original Drawing Label IP65; L2-X Original Drawing Label IP65 Specification differences require technical review |
| Service Life | H Structure 20000 h | L1/L2 H Drawing Annotation |
| Weight | H Structure L1 0.16 kg; L2 0.25 kg | Only H Value on Original Drawing; X Verify Structure Separately |
H Structure: L1 3/4/5/7/10; L2 12/15/16/20/25/28/30/35/40/50/70/100. Blank Rated Torque Values Require Separate Confirmation; X Use the corresponding original drawing and technical review for this structure.
By Motor Input Shaft Diameter, Find matching files using pilot diameter and mounting hole spacing L1 / L2 Engineering Resources.
H Structure by 5-20-28 Find 2D Drawings & Corresponding Files by Interface STEP; X Structure-Specific 2D Drawings Are Listed Separately, Not Received X Structure STEP.
4 Original 2D Drawings; Only H Structure L1/L2 Each Has Corresponding STEP, X Structure Has No STEP.
X Structure Currently Has No STEP; L2-X Torque in the Original Drawing, Speed, Load Capacity & Weight Compared with H Different, Requires Technical Verification, Do Not Use H Another Structure’s Parameters as a Substitute.
First confirm the gear ratio, Load, Output Speed, Mounting orientation and motor interface. The same frame size may have different interfaces and configurations.
Find resources on this page or in the Download Center, Confirm the final version against the motor interface and machine mounting dimensions.
Provide the Motor Model, Load, Target Speed, Required Torque, Cycle Time & Installation Space, Our engineers can help confirm the requirements.
Submit PLF028 Motor Model for, Gear Ratio, Load & Mounting Conditions, Our engineers will review a single consolidated specification sheet.